Fabric Reconciliation in Garment Industry: Report Format
How to reconcile fabric per PO in a garment factory: received, short, rejected, issued to cutting, end bits and balance, with a worked example and format.
By Radiatus team · Published 04 Nov 2026 · Updated 04 Nov 2026 · 8 min read
Fabric reconciliation in the garment industry is the account of where every kilogram or metre of fabric on a purchase order went: how much was ordered, how much the mill invoiced, how much actually arrived, how much was rejected or returned, how much went to cutting and came back, and how much is left in the store. Done per PO, it tells the merchandiser what to claim from the mill, tells costing what the style really consumed and tells the store what it can use for the next order. This guide gives the chain line by line, the formulas, a worked kg example, the yard variant and a fabric reconciliation report format with sign-off.
What is fabric reconciliation?
Think of it as a bank statement for fabric. The opening figure is what the mill says it sent (the tickets and invoice). Every movement afterwards either reduces the fabric in hand (rejected rolls returned, issues to the cutting room, samples) or adds back to it (unused fabric returned from cutting). The closing figure is the store balance, which someone should be able to walk to the store and see on the shelf. When the statement does not balance, there is either missing fabric or a missing record, and both cost money.
Reconciliation is different from consumption planning, which is the marker and CAD work that decides how much fabric a style should need. Reconciliation is after the fact: it records what really happened, so it can be compared with the plan.
When to reconcile: per PO, per style, at shipment
- Per fabric PO, as soon as all rolls are received and inspected: this is when shortages against the mill's tickets can still be claimed.
- Per style or order, when cutting is complete: this is when consumption and end bits are known.
- At shipment, as a final check that no fabric is unaccounted for and the balance is either booked for another order or written off with a reason.
Most exporters do all three on the same sheet, filling it in as the PO moves through the factory. The habit that makes reconciliation work is recording movements when they happen, with a reference (DC number, cut number), not reconstructing them at the end.
The reconciliation chain, line by line
- Ordered (PO quantity): what you asked the mill for, in the PO's unit (kg for most knits, metres or yards for wovens).
- Received per mill tickets: the sum of the ticket weights or lengths on the rolls that arrived. This is what you are invoiced for.
- Measured: the sum of what you actually weighed (net of tube and polybag) or measured on the inspection frame.
- Shortage = received − measured. This is the quantity the mill sent less than it billed.
- Rejected rolls: rolls that failed inspection, by their measured quantity.
- Returned to mill: rejected or excess fabric physically sent back, with the delivery challan number.
- Issued to cutting: fabric handed to the cutting room, by cut number.
- Returned from cutting: unused lays and short rolls brought back to the store.
- End bits: the leftover pieces after cutting, weighed or measured.
- Samples: fabric cut for buyer samples, lab tests and approvals.
- Adjustments: anything else, plus or minus, always with a note.
Two results come out of the chain:
Store balance = measured − returned to mill − issued to cutting + returned from cutting − samples ± adjustments
Cutting consumption including waste = issued to cutting − returned from cutting − end bits
Worked example: one knit PO in kg
PO-4512 for single jersey, 180 GSM, ordered 3,000 kg (sample data):
| Line | Quantity (kg) | How it is found |
|---|---|---|
| Ordered | 3,000.0 | PO |
| Received per mill tickets (118 rolls) | 2,962.0 | Sum of ticket weights |
| Measured (net) | 2,931.4 | Sum of net weights after removing tube and polybag |
| Shortage | 30.6 (1.03 %) | 2,962.0 − 2,931.4 |
| Rejected rolls (6 failed) | 148.2 | Measured weight of failed rolls |
| Returned to mill | 148.2 | DC-3391 |
| Issued to cutting | 2,610.0 | CUT-101 to CUT-124 |
| Returned from cutting | 41.5 | Unused lays |
| End bits | 38.7 | Weighed after cutting |
| Samples | 4.0 | Buyer and test samples |
| Store balance | 210.7 | 2,931.4 − 148.2 − 2,610.0 + 41.5 − 4.0 |
| Cutting consumption incl. waste | 2,529.8 | 2,610.0 − 41.5 − 38.7 |
| Claimable shortage | 30.6 kg × ₹420 = ₹12,852 | At the PO rate per kg |
Read the table from the merchandiser's side: the mill billed 2,962.0 kg but delivered 2,931.4 kg, so ₹12,852 is claimable at ₹420 per kg. Six rolls failed inspection and went back on DC-3391, so they are no longer in the store and should be credited or replaced. The cutting room took 2,610.0 kg, brought 41.5 kg back and produced 38.7 kg of end bits, so the style consumed 2,529.8 kg including cutting waste, which costing can compare with the marker plan. And 210.7 kg should be on the store shelf. If the store counts 190 kg, the 20.7 kg difference needs an explanation before the PO is closed.
Knit fabric is bought by weight but graded and cut by area. If you need the length, our kg to meter fabric calculator converts weight to metres and yards from GSM and width.
Reconciling in yards for woven fabric
For wovens bought by length the chain is identical, with lengths instead of weights. "Received" is the sum of ticket lengths, "measured" is the sum of lengths from the inspection frame's counter, and the shortage is again received minus measured. Keep one unit through the whole sheet: if the PO is in metres and the frame counts yards, convert once (1 yd = 0.9144 m) and say so at the top of the report. Mixing units line by line is the most common reason a reconciliation does not balance.
Where debit notes and returns to the mill fit
Two different things can be owed by the mill, and they should be claimed separately:
- A quantity claim for the shortage line: fabric billed but not delivered, valued at the PO rate per kg or per metre.
- A quality claim for rolls that failed inspection: either the rolls go back (the "returned to mill" line) and are credited or replaced, or they are kept and a deduction is agreed.
Every claim needs evidence: roll numbers, ticket and measured figures, and for quality claims the defect map and photos. Our guide on how to raise a debit note to a fabric mill covers the format and follow-up. The reconciliation sheet should show the open claims for the PO and their status, so nobody closes a PO with money still owed.
Fabric reconciliation report format
A one-page fabric reconciliation report format that covers what buyers, costing and accounts usually ask for:
| Block | Fields |
|---|---|
| Header | PO number, style, buyer, mill, fabric, GSM / width, unit (kg / m / yd), date |
| Quantities | Ordered, received per tickets, measured, shortage (qty and %), rejected rolls (count and qty) |
| Movements | Returned to mill (DC no.), issued to cutting (cut nos.), returned from cutting, end bits, samples, adjustments with notes |
| Results | Store balance, cutting consumption incl. waste, variance received vs ordered |
| Claims | Debit notes on the PO: number, type (quantity / quality), amount, status |
| Sign-off | Fabric store, cutting in-charge, merchandiser, date; note explaining any non-zero balance at closing |
Tolerances belong on the sheet too. Many buyers and mills agree a weight or length tolerance on delivery (for example a percentage of the ticket); a shortage inside it is noted, a shortage outside it is claimed. Use the figure in your agreement with the mill, not a general rule.
Common gaps and how to close them
- Unrecorded end bits. End bits thrown in a corner are counted as consumption and the style looks more expensive than it was. Weigh them per cut.
- Short tickets not caught at receiving. If rolls are opened before the ticket figures are recorded and the rolls weighed, the shortage cannot be proved. Record tickets and weights before inspection.
- Samples taken without a note. A few kilos for buyer samples and lab tests add up over a season. Book them as a movement with the sample reference.
- Returns from cutting not booked back. Unused lays sitting in the cutting room are invisible to the store. Book them back the same day.
- Tube and polybag left in the weight. Counting the tare as fabric hides a real shortage. Subtract it every time.
Reconcile from your inspection records
In Fabric Inspection Software, the reconciliation for a PO builds itself from records the QC team already keeps. Ticket weights or lengths come from roll intake, measured quantities from the weight check or the inspection frame, rejected rolls from the inspection results, and open claims from the debit notes on the PO. The store and cutting room add movements (returns to the mill, issues to cutting by cut number, returns, end bits, samples, adjustments), and rolls issued from the relaxation board are booked automatically. The page shows the store balance and cutting consumption with the formulas, prints as a one-page report and exports to CSV; closing a PO with a non-zero balance asks for a note. It does not do marker planning or GST stock accounting. See fabric reconciliation on the features page and the plans on the pricing page.
Questions people ask
What is fabric reconciliation in the garment industry?
It is the per-PO account of fabric from order to balance: ordered, received per mill tickets, measured, short, rejected, returned to the mill, issued to cutting, returned, end bits, samples and what is left in the store. It shows what to claim from the mill, what a style consumed and what stock remains.
How do you calculate the fabric balance after cutting?
Store balance = measured quantity − returned to mill − issued to cutting + returned from cutting − samples ± adjustments. In the worked example: 2,931.4 − 148.2 − 2,610.0 + 41.5 − 4.0 = 210.7 kg. The balance should match a physical count in the store before the PO is closed.
What are end bits in fabric reconciliation?
End bits are the leftover pieces after a lay is cut, too short for another garment panel. They are weighed or measured and recorded per cut, because cutting consumption including waste is calculated as issued to cutting minus returned from cutting minus end bits. Unrecorded end bits make consumption look higher.
Who prepares the fabric reconciliation report?
Usually the fabric store prepares it with the cutting in-charge, and the merchandiser checks it and signs it off, because the merchandiser raises claims and answers to costing. In Fabric Inspection Software the report builds from roll intake, inspection and movement records, so the store mainly adds movements.
How do you treat a length or weight shortage from the mill?
Compare the measured total with the ticket total for the PO, check it against the delivery tolerance agreed with the mill, and raise a quantity claim for the shortage at the PO rate, with roll-wise ticket and measured figures as evidence. Keep it separate from any quality claim for failed rolls.
Should fabric be reconciled in kg or metres?
In the unit of the PO. Knits bought by the kilogram are reconciled in kg; wovens bought by length in metres or yards. Use one unit for the whole sheet and convert once at the top if the frame measures in another unit; mixing units is a common reason reconciliations do not balance.
Related guides
Fabric Inspection Checklist: Printable, Stage by Stage
A printable fabric inspection checklist for mills and garment exporters: receiving, set-up, 4-point inspection, checks, relaxation and release to cutting.
Fabric Inspection Procedure: SOP Template and Flow Chart
A fabric inspection procedure to adopt as your SOP: scope, roles, sampling, set-up, 4-point grading, records and a flow chart from receipt to cutting.