Before cutting · knits, spandex blends, stretch wovens

Fabric relaxation: time chart, SOP and a tracker that stops early cutting

Fabric relaxation is resting fabric, unrolled or loosely laid, for a set number of hours before cutting so that the tension built up in knitting, finishing and rolling can recover and panels do not shrink after they are cut. This page gives a starter relaxation time chart, a step-by-step fabric relaxation SOP, the relaxation card fields, a fabric relaxation report format and a way to measure relaxation shrinkage.

In short: Fabric relaxation means letting fabric rest without tension before cutting. Published factory SOPs use roughly 10 to 48 hours for knits, with spandex blends near 48 hours; the buyer's manual decides. Record start time, minimum hours, rack, width before and after, and who released each roll. Fabric Inspection Software times every roll on a board and locks issue-to-cutting until the time is up.

What is fabric relaxation in the garment industry?

In a garment factory, fabric relaxation is the step between receiving and inspecting fabric and cutting it. The rolls are opened up, the fabric is laid loosely on racks, pallets or a relaxing machine, and it is left alone for a fixed time. During that time the fabric contracts towards its natural, unstressed dimensions. Cutting only after it has settled means the cut panels keep their size through sewing and pressing instead of shrinking on the cutting table or in the bundle.

Relaxation is written into most buyers' cutting-room requirements for knits and stretch fabrics, and into many factories' own standard operating procedures. It costs floor space and time, so the pressure to skip it when a shipment is late is real. That is exactly why the start time, the hours and any early release need to be on record.

Which fabrics need relaxation and why?

Any fabric that was stretched while it was made or finished and then rolled under tension. In practice:

  • Knits (single jersey, rib, interlock, pique, fleece): loops are pulled lengthwise during knitting, compacting and winding, and recover mostly in length once unrolled.
  • Spandex (elastane, lycra) blends: the elastic yarn recovers slowly, so they usually need the longest rest.
  • Stretch and some cotton wovens (twill, denim with stretch): tension from finishing and rolling relaxes more slowly than in knits.

Transport adds to it: rolls stacked on a truck for two days in Tamil Nadu heat are not in the state they left the compactor. Relaxation does not fix a fabric with poor dimensional stability; it only stops you cutting before the fabric has shown what it will do.

Fabric relaxation time chart

These are the starter values Fabric Inspection Software ships with, taken from published factory SOPs (for example the knit relaxation chart on textiledetails.com, which ranges from about 10 to 48 hours by fabric). They are not a standard: your buyer's manual overrides them, and every value is editable per fabric and per buyer in the app.

Fabric / constructionTypical fibreStarter minimum hoursMethod
Spandex, elastane or lycra blends (jersey, rib, leggings fabric)Cotton or polyester with a small share of elastane48 hUnrolled or loosely folded
Single jersey, rib, interlock, pique, fleece100 % cotton or cotton-rich24 hUnrolled or loosely folded
Woven cotton: twill, denimCotton, cotton-polyester24 hOn racks
Anything else (default)—24 hUnrolled

Starter values from published factory SOPs; replace them with your buyer's figures. Some buyers allow a shorter time on a relaxing machine; record the method so the report shows it.

How long should fabric relax before cutting?

The buyer's manual decides, then your own SOP, then a chart like the one above. When the manual says "minimum 24 hours", count from the time the last roll of the lay was opened, not from when the lot arrived. Overnight relaxation is the usual practical pattern: fabric opened in the afternoon shift is ready for the next day's cutting. If the cutting plan needs a roll before its time, the answer is a recorded early release by the person your SOP names, not a quiet change of the start time.

Fabric relaxation SOP, step by step

  1. Select the rolls. Take the rolls of the lot that the cutting plan needs next and look up the relaxation hours for the fabric and buyer.
  2. Unroll or loosen the fabric. Lay it in loose folds on racks or pallets, face up, away from heat and direct sun, or feed it through a relaxing machine. Never leave it under its own roll weight.
  3. Tag the rack with a relaxation card. Write or print the card (fields below) and fix it where the cutting supervisor can read it.
  4. Time the rest. Leave the fabric for at least the minimum hours. Nobody moves it to the cutting table early.
  5. Re-measure. Measure the width (and length where the buyer asks) again and work out the relaxation shrinkage.
  6. Release to cutting. Issue the roll with its cut number. An early release needs the named approval and a reason.
  7. Record and file. Keep the relaxation report for the lot: start, ready and issue times, actual hours, early releases and shrinkage.

Who does what

StepFabric storeCutting supervisorQA / QC head
Select rolls and open themDoesRequests by cutting plan—
Card and start timeDoesChecks—
Hours from chart or buyer manualApplies—Owns the chart
Re-measure width / lengthDoes—Reviews shrinkage
Release to cuttingIssuesReceives—
Early release—RequestsApproves with reason

Relaxation card: the fields to print

Published SOPs list a relaxation card of about a dozen fields. The ones that matter: buyer, PO, style, fabrication, roll number, colour, dye lot, start date and time, minimum hours, rack or location, and two blank lines for cut date and cut number. Add a QR code that opens the roll's record and the card stops being a scrap of paper and becomes evidence. Fabric Inspection Software prints this card at A6 label size for every roll it starts timing.

Fabric relaxation report format

A useful relaxation report has one row per roll and these columns. The four rows below are sample data.

RollFabricMin hStartReadyIssuedActual hEarly releaseWidth before → after (in)Relaxation shrinkage
R-309895/5 cotton spandex jersey 200 GSM4801 Nov 03:1003 Nov 03:1003 Nov 06:1551.1N68.0 → 67.2−1.2 %
R-309995/5 cotton spandex jersey 200 GSM4801 Nov 05:1003 Nov 05:1003 Nov 06:4049.5N68.0 → 67.1−1.3 %
R-310095/5 cotton spandex jersey 200 GSM4801 Nov 19:1003 Nov 19:1003 Nov 07:1036.0Y · buyer approved 36 h, mail 02-Nov68.0 → 67.4−0.9 %
R-0712Grey melange 1×1 rib 220 GSM2402 Nov 14:0003 Nov 14:0003 Nov 15:3025.5N38.0 → 37.7−0.8 %

Sample data · illustrative report · rolls and dates are fictitious

How do you measure relaxation shrinkage?

Measure the width (and, if the buyer asks, a marked length) when the roll is opened and again when it is released. Relaxation shrinkage % = (after − before) ÷ before × 100; a negative figure means the fabric got smaller. A roll that goes from 68.0 to 67.2 inches has shrunk (67.2 − 68.0) ÷ 68.0 × 100 = −1.2 %. Averaged over a lot, it tells the cutting room whether its marker width is right.

Relaxation shrinkage is not wash shrinkage. Dimensional stability to washing is a separate test after laundering, covered in our guide to the fabric shrinkage test method and formula. A fabric can relax neatly and still fail the wash test, so record both.

Early release: who approves and what to record

Sometimes a roll must go to cutting before its time. Make that a visible decision: name who may approve it (usually the QA head or factory manager), and record the reason, the approver and the actual hours. If the buyer agreed to a shorter time, keep the reference to their mail. Shown in red on the report, early releases are easy to review afterwards, and a pattern of them is a planning problem rather than a cutting-room one.

Track relaxation for every roll

Fabric Inspection Software turns the SOP above into a board for the fabric store, on a TV or a tablet. Start relaxation for one roll from its record, or for a whole lot in one step; the app picks the hours from your relaxation chart, using a buyer-specific rule first, then the fabric words (spandex, rib, twill), then the construction, then your default.

  • Countdown board with Relaxing, Ready, Issued today and Overdue columns, refreshed every 60 seconds.
  • Issue to cutting is locked until the time is up; owners and admins can release early only with a reason, which goes to the audit log and shows in red on the report.
  • Relaxation card printed at A6 with the roll's QR code and blank cut-date and cut-number lines.
  • Relaxation report per lot or date range, printable and as CSV, with width and length before and after.
  • Ready alerts in the app when a roll's time is up, and optionally a WhatsApp message to the cutting supervisor.

The app times relaxation; it does not measure tension, temperature or humidity.

Sample data · illustrative screen · rolls are fictitious

Paper card, spreadsheet or tracker?

Paper relaxation cardExcel logTypical QC softwareFabric Inspection Software
Start time and hours per rollHandwrittenTyped laterNot found in the public material we reviewedRecorded at start, hours from your chart
Stops cutting before timeNoNo—Issue locked; early release needs a reason
Countdown for many rollsNoNo—Board, refreshed every 60 s
Relaxation shrinkage per roll and lotRarelyManual formula—Width and length before / after, %
Report for the buyer's QAFile of cardsSheet—Printable report and CSV

As of November 2026; check with each vendor. "—" means we could not find relaxation tracking in the public material of the QC platforms we reviewed.

The relaxation tracker is on every plan, from ₹4,999 a month on the Unit plan (GST extra). See pricing, the relaxation tracker on the features page, our guide to inspecting knitted fabric and the fabric inspection checklist, whose last stage is release to cutting.

Fabric relaxation questions

What is fabric relaxation in the garment industry?

Fabric relaxation is resting fabric, unrolled or loosely laid, for a set number of hours before cutting so that tension from knitting, finishing, rolling and transport can recover. It reduces the shrinkage and size variation that otherwise appear after the garment is cut and sewn. Fabric Inspection Software times it per roll.

How long should fabric relax before cutting?

As long as the buyer's manual says. Published factory SOPs give ranges of roughly 10 to 48 hours for knits depending on fabric, with spandex blends at the top of that range. Our starter chart uses 24 hours for cotton knits and wovens and 48 hours for spandex blends; replace these with your buyer's figures.

Why is relaxation needed for knitted fabric?

Knitted loops are stretched lengthwise during knitting, compacting and winding. On the roll they stay under tension; once unrolled they slowly contract, mostly in length. If the fabric is cut before that happens, panels shrink after cutting and garments come out short or uneven. Relaxation lets the fabric settle first.

What is the relaxation time for spandex (lycra) fabric?

Spandex (elastane, lycra) blends usually need the longest rest because the elastic yarn recovers slowly. Published SOPs commonly put them around 48 hours, and that is the starter value in Fabric Inspection Software. It is a starting point, not a standard: follow the buyer's manual, which may ask for more or less.

What should a fabric relaxation report contain?

For each roll: roll number, fabric, the rule and minimum hours, start time, ready time, issue time and actual hours, whether it was released early and why, width and length before and after, and the relaxation shrinkage percentage. Fabric Inspection Software prints this report per lot or date range and exports the same columns as CSV.

Does relaxation replace a shrinkage test?

No. Relaxation shrinkage is the change in width and length while the fabric rests, before cutting. Wash shrinkage, or dimensional stability to washing, is a separate test after laundering, for example to ISO 6330 and ISO 5077. A roll can relax well and still fail the wash test, so both are recorded.

Can fabric be relaxed by machine instead of on racks?

Yes. Relaxing machines feed fabric with little tension, sometimes with steam, so the fabric settles faster than on racks. Whether a shorter time is acceptable is the buyer's decision. Fabric Inspection Software records the method (unrolled, rack or machine) on each relaxation, so the report shows how every roll was relaxed.

How do you track relaxation time for hundreds of rolls?

With a timer per roll rather than one card per rack. In Fabric Inspection Software you start relaxation for a whole lot in one step, the board counts down every roll, ready rolls move to their own column, and the issue-to-cutting button stays locked until the time is up unless an owner or admin records a reason.

Inspect the first roll the same day

We load your defect master, buyer limits and report layout, then train your inspectors on the floor in Tirupur, Surat or Ludhiana, or over a video call. 14-day pilot, no card. Plans start at ₹4,999 a month with unlimited rolls, and every result follows the ASTM D5430 4-point rules and your buyer's own limit.